News in Detail

Preparatory Construction Work on Alte Kaulsdorfer Strasse

16. May 2017

On Alte Kaulsdorfer Strasse, the preparatory construction work is now under way.

The building site was cleared, while the old utility building that stood on the property was razed. The construction pit is being excavated, and soil stabilisation measures are under way. At the same time, the rainwater drain is being laid.